Inspection |
1. |
Turn the ignition switch OFF. |
2. |
Disconnect the VIS valve connector. |
3. |
Measure resistance between VIS valve terminals 1 and 2.
|
Removal |
1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
2. |
Disconnect the variable intake solenoid valve connector (A). |
3. |
Disconnect the vacuum hoses (B) from the valve. |
4. |
Remove the installation nut, and then remove the valve from the surge tank. |
Installation |
|
|
1. |
Install in the reverse order of removal. |
Hyundai Tucson (LM) 2010-2015 Service Manual: Purge Control Solenoid Valve (PCSV) Repair procedures
Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the PCSV connector.
3.
Measure resistance between the PCSV terminals 1 and 2.
4.
Check that the resistance is within the specification.
Specification: Refer to “Specification”
Removal
1.
Turn the ignition switc ...
Hyundai Tucson (LM) 2010-2015 Service Manual: Front Driveshaft Repair procedures
Removal
1.
Remove the front wheel and tire (A) from front hub .
Tightening torque:
88.2 ~ 107.8 N.m (9.0 ~ 11.0 kgf.m, 65.0 ~ 79.5 lb-ft)
Be careful not to damage to the hub bolts when removing the front wheel and tire (A).
2.
Remove the coking nut (A).
Tig ...