| Components |
| [LH] |

| 1. BJ assembly 2. BJ circlip 3. BJ boot band 4. BJ boot | 5. Shaft 6. TJ boot band 7. TJ boot 8. Spider assembly | 9. Retainer ring 10. TJ housing 11. Housing circlip |
| [RH] |

| 1. BJ assembly 2. BJ circlip 3. BJ boot band 4. BJ boot | 5. Dynamic damper band 6. Dynamic damper 7. Shaft 8. TJ boot band | 9. TJ boot 10. Spider assembly 11. Retainer ring 12. TJ housing | 13. Housing circlip |
Front Driveshaft Repair procedures
TJ Joint Repair proceduresHyundai Tucson (LM) 2010-2015 Service Manual: Rear Driveshaft Repair procedures
Removal
1.
Loosen the wheel nuts slightly.
Raise the vehicle, and make sure it is securely supported.
2.
Remove the rear wheel and tire (A) from rear hub.
Tightening torque:
88.2 ~ 107.8 N.m (9.0 ~ 11.0 kgf.m, 65.0 ~ 79.5 lb-ft)
Be careful not to damage to the ...
Hyundai Tucson (LM) 2010-2015 Service Manual: Canister Close Valve (CCV) Repair procedures
Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the CCV connector.
3.
Measure resistance between the CCV terminal 1 and 2.
4.
Check that the resistance is within the specification.
Specification: Refer to "Specification"
5.
Disconnect the vapor hose connected with ...