| Inspection |
| 1. |
There should be continuity between the No.11 in the A and
No.12 in the A terminals when power and ground are connected to the No.2
in the A and No.11 in the A terminals. |
| 2. |
There should be no continuity between the No.11 in the A and No.12 in the A terminals when power is disconnected. |
| 1. |
There should be continuity between the No.19 in the A and
No.20 in the A terminals when power and ground are connected to the No.9
in the A and No.10 in the A terminals. |
| 2. |
There should be no continuity between the No.19 in the A and No.20 in the A terminals when power is disconnected. |
| 1. |
There should be continuity between the No.12 in the B and
No.13 in the B terminals when power and ground are connected to the
No.10 in the A and No.3 in the B terminals. |
| 2. |
There should be no continuity between the No.12 in the B and No.13 in the B terminals when power is disconnected. |
| 1. |
There should be continuity between the No.4 in the B and No.6
in the B terminals when power and ground are connected to the No.4 in
the B and No.5 in the B terminals. |
| 2. |
There should be no continuity between the No.4 in the B and
No.6 in the B terminals in the A terminals when power is disconnected. |
| 1. |
There should be continuity between the No.3 in the A and No.8
in the A terminals when power and ground are connected to the No.5 in
the A and No.6 in the A terminals. |
| 2. |
There should be no continuity between the No.3 in the A and No.8 in the A terminals when power is disconnected. |
| 1. |
There should be continuity between the No.19 in the A and
No.20 in the A terminals when power and ground are connected to the No.9
in the A and No.10 in the A terminals. |
| 2. |
There should be no continuity between the No.19 in the A and No.20 in the A terminals when power is disconnected. |
| 1. |
There should be continuity between the No.12 in the B and
No.13 in the B terminals when power and ground are connected to the
No.10 in the A and No.3 in the B terminals. |
| 2. |
There should be no continuity between the No.12 in the B and No.13 in the B terminals when power is disconnected. |
ICM (Integrated Circuit Module) Relay Box Description and Operation
PDM Relay Box Description and OperationHyundai Tucson (LM) 2010-2015 Service Manual: Heater Core Repair procedures
Replacement
1.
Remove the crash pad.
(Refer to Heater - "Heater Unit")
2.
Loosen the mounting screw and then remove the heater core cover (A).
3.
Remove the heater core.
4.
Be careful that the inlet and outlet pipe are not bent during heater core removal, and pull out the heater co ...
Hyundai Tucson (LM) 2010-2015 Service Manual: Anchor Pretensioner Repair procedures
Removal
1.
Disconnect the battery negative cable, and wait for at least three minutes before beginning work.
2.
To remove the seat belt anchor pretensioner (C), keep on
pushing the lock pins (A) as arrow direction. And then remove the seat
belt after pushing the lock pin (B).
3.
Rem ...