Hyundai Tucson (LM) 2010-2015 Service Manual: Valve Body Repair procedures
Removal
1.
Remove the air duct.
(Refer to Engine Mechanical System - "Air cleaner")
2.
Remove the battery and the battery tray.
(Refer to Engine Electrical System - "Battery")
3.
Remove the under cover (A).
Tightening torque :
19.6 ~ 24.5 N.m (2.0 ~ 2.5 kgf.m, 14.5 ~ 18.1 lb-ft) ...
Hyundai Tucson (LM) 2010-2015 Service Manual: Rail Pressure Sensor (RPS) Schematic Diagrams
Circuit Diagram
(M/T)
(A/T)
...